Medical waste incineration system of 300 kg/hr burn rate with dual fuel (gas and diesel) type, daily 8-16 hrs operation and a stack height of 15 meter.Primary combustion
i. The primary combustion chamber shall be accepted as the primary combustion zone;
ii. The minimum combustion temperature of the primary chamber shall not be less than 800 degrees C;
Secondary combustion
The residence time in the secondary chamber shall not be less than 2 seconds;
The gas temperature as measured against the inside wall in the secondary chamber, not in the flame zone, shall not be less than as indicated in Lots 1-7 ;
Both the primary and the secondary temperatures shall be maintained until all the waste has been completely combusted;
Chimney
The chimney shall have a minimum height of 4 meters above ground level;
The minimum exit velocity of the emissions shall not be less than 10 metres/second;1. Capacity of destruction in weight: 60 Kg/h.
2. It should be able to operate not less than 10 hours/day
3. This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…
4. Design Specification : Types A, B, C, D, and E of medical waste
5. "PYROLYTIC" combustion, by controlling the gasification of waste.
6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
7. It should be able to reduce the volume of wastes by 98%.
8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.
9. The incineration should be completely free from visible smoke as well as offensive odours.
10. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
• The Temperatures of combustion: Minimum will be 850oC and max 1400oC
• Post combustion: >1100oC.
11. The Internal diameter of the Chimney: Ø 400 and its height: 8 m
12. The Volume of the combustion chamber: 1.200 L
13. The Dimension of the door for loading in cm: 70x70.
14. Burner operation should be Automatic On/Off
15. Fuel : diesel
16. The supplier must provide necessary information for the best of the installation
This incinerator with "PYROLYTIC" combustion must have:
17. A combustion chamber of waste:
* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch Load
* A burner of lighting which the use is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.
* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium and insulates bricks in order to assure a minimum temperature on the outside sheet metal.
* Composition of the refractory;
• Refractory concrete :
. Thickness : ≥100 mm
. Nature: 42% of Al203
• Insulate in fibrous panels :
. Thickness: ≥75 mm
• Nature: Calcium silicate.
* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.
18. A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total recombustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
• Refractory concrete :
Thickness : ≥150 mm
Nature: 65% of Al203
• Insulate in fibrous panel :
Thickness: ≥85 mm
Nature: Calcium
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* A secondary injection of air to ensure perfect oxygen content.
19. A control box ensuring the complete cycle of combustion.
20. Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.
21. Controls and regulations:
Control box watertight to dust, including:
* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion.
* A regulator with digital watching for the temperature of postcombustion.
* Electric box.
21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual batch de ashing.
22. Process Filtering system: Scruber to be mentionned as optional
23. Emission Standards Compliance: BS 3316 or équivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22. The supplier must give batches of spare parts of first urgency and consumable of the incinerator.
23. The installed incinerator must bear a one year guarantee.
24. The supplier shall perforn an onsite installation of the incinerator.
25. The technical training of operators will have to be provided and given by a technician
from the factory; it will consist of curative and preventive maintenance, and the use of machine, etc
Orignal From: Medical waste incineration system
Waste Incinerators|Medical Incinerator|Animal Incinerator|Pet Cremation|China Incinerator Manufacturer
Sunday, February 12, 2017
Wednesday, January 18, 2017
HIGH TECH MEDICALWASTE INCINERATOR
Incinerator model A
Burn Rate 65kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years
i. The primary combustion chamber shall be accepted as the primary combustion zone;
ii. The minimum combustion temperature of the primary chamber shall not be less than 800 degrees C;
Secondary combustion
The residence time in the secondary chamber shall not be less than 2 seconds;
The gas temperature as measured against the inside wall in the secondary chamber, not in the flame zone, shall not be less than as indicated in Lots 1-7 ;
Both the primary and the secondary temperatures shall be maintained until all the waste has been completely combusted;
Chimney
The chimney shall have a minimum height of 4 meters above ground level;
The minimum exit velocity of the emissions shall not be less than 10 metres/second;
Temperature Warnings
An audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature;
General
Control box can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter height;
Lot 2
Item 5 Incinerator model B
Burn Rate 150kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Diesel/LPG/LNG, please indicate
Power Supply for Control Box- 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
Item 6 10m Hose Pipe, indicate length
Item 7 I000 Litre Fuel Tank + Pipe System, indicate volume
Item 8 Additional chimney extension, indicate height
Warranty, indicate no of years
Lot 3
Item 9 Incinerator model C
Burn Rate 250kg/h minimum
Weight (kg) please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
Item 10 10m Hose Pipe, indicate length
Item 11 I000 Litre Fuel Tank + Pipe System, indicate volume
Item 12 Additional chimney extension, indicate height
Warranty, indicate no of years
Lot 4 – High Temperature Waste Incinerator
Item 13 HTW Incinerator model D
Burn Rate - 150kg/hour minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V, single phase 50-60Hz
Minimum operating temperature 1200°C, please indicate
One year Spare Parts Package for complete maintainability
Item 14 10m Hose Pipe, indicate length
Item 15 1000 Litre Fuel Tank + Pipe System, indicate volume
Item 16 Additional chimney extension, indicate height
Warranty, indicate no of years
Lot 5 – Mobile Incinerator
2. Incinerator provides 2 chamber incineration and holds gasses for a minimum of 2 seconds.
3. Each incinerator must have adequate labelling for parts/areas of high occupational health and safety risk on the incinerator.
4. Evidence their product meets relevant national or international emissions standards, such as the United States Environmental Protection Agency, United Kingdom Department for Environment Food
& Rural Affairs, or European Union regulations and directives.
Item 17 Mobile Incinerator model E
Burn Rate 50kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
Item 18 10m Hose Pipe, indicate length
Item 19 1000 Litre Fuel Tank + Pipe System, indicate volume
Item 20 Additional chimney extension, indicate height
Lot 6 – Mobile Incinerator
Item 21 Mobile Incinerator model F
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
Item 22 10m Hose Pipe, indicate length
Item 23 1000 Litre Fuel Tank + Pipe System, indicate volume
HTW Mobile Incinerator model G
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 1200 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Orignal From: HIGH TECH MEDICALWASTE INCINERATOR
Burn Rate 65kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years
i. The primary combustion chamber shall be accepted as the primary combustion zone;
ii. The minimum combustion temperature of the primary chamber shall not be less than 800 degrees C;
Secondary combustion
The residence time in the secondary chamber shall not be less than 2 seconds;
The gas temperature as measured against the inside wall in the secondary chamber, not in the flame zone, shall not be less than as indicated in Lots 1-7 ;
Both the primary and the secondary temperatures shall be maintained until all the waste has been completely combusted;
Chimney
The chimney shall have a minimum height of 4 meters above ground level;
The minimum exit velocity of the emissions shall not be less than 10 metres/second;
Temperature Warnings
An audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature;
General
Control box can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter height;
Lot 2
Item 5 Incinerator model B
Burn Rate 150kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Diesel/LPG/LNG, please indicate
Power Supply for Control Box- 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
Item 6 10m Hose Pipe, indicate length
Item 7 I000 Litre Fuel Tank + Pipe System, indicate volume
Item 8 Additional chimney extension, indicate height
Warranty, indicate no of years
Lot 3
Item 9 Incinerator model C
Burn Rate 250kg/h minimum
Weight (kg) please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
Item 10 10m Hose Pipe, indicate length
Item 11 I000 Litre Fuel Tank + Pipe System, indicate volume
Item 12 Additional chimney extension, indicate height
Warranty, indicate no of years
Lot 4 – High Temperature Waste Incinerator
Item 13 HTW Incinerator model D
Burn Rate - 150kg/hour minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V, single phase 50-60Hz
Minimum operating temperature 1200°C, please indicate
One year Spare Parts Package for complete maintainability
Item 14 10m Hose Pipe, indicate length
Item 15 1000 Litre Fuel Tank + Pipe System, indicate volume
Item 16 Additional chimney extension, indicate height
Warranty, indicate no of years
Lot 5 – Mobile Incinerator
2. Incinerator provides 2 chamber incineration and holds gasses for a minimum of 2 seconds.
3. Each incinerator must have adequate labelling for parts/areas of high occupational health and safety risk on the incinerator.
4. Evidence their product meets relevant national or international emissions standards, such as the United States Environmental Protection Agency, United Kingdom Department for Environment Food
& Rural Affairs, or European Union regulations and directives.
Item 17 Mobile Incinerator model E
Burn Rate 50kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
Item 18 10m Hose Pipe, indicate length
Item 19 1000 Litre Fuel Tank + Pipe System, indicate volume
Item 20 Additional chimney extension, indicate height
Lot 6 – Mobile Incinerator
Item 21 Mobile Incinerator model F
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
Item 22 10m Hose Pipe, indicate length
Item 23 1000 Litre Fuel Tank + Pipe System, indicate volume
HTW Mobile Incinerator model G
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 1200 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Orignal From: HIGH TECH MEDICALWASTE INCINERATOR
Specifications for Double Chamber Incinerator
INCINERATOR DESCRIPTION
The Model is for up to 300kgs capacity per batch load and will burn at around 55kgs per hour.
The unit has top loading design and has a heavy duty refractory cement lining for maximum heat retention. Unit have large top lid for easy loading, and specially designed front ash door, for ash removal.
This unit operates at over 1100°C in the primary chamber to ensure complete combustion. This model also benefits
from a heavy duty secondary chamber and burner which ensures a complete re-burn of any smoke and emissions and a 0.5 second gas retention time.
Burn rate 150kg/h minimum
Secondary Chamber Yes
Gas Retention Time 2 seconds
Fuel Diesel/LPG/LNG
Power Supply for Control Box 220V-240V 50Hz single phase
Minimum Operating Temperature 920˚C
PRIMARY CHAMBER
Heavy-duty steel casing
High quality refractory lining and insulation
Large full size top load door and liquid retention sill
1 x diesel oil fired ignition burners operated on/off
SECONDARY CHAMBER
Heavy-duty steel casing
High quality refractory lining and insulation
1 x diesel oil fired ignition burners operated on/off
Specifications for Double Chamber Incinerator:
Primary Combustion
The primary combustion chamber shall be accepted as the primary combustion zone.
The minimum combustion temperature of the primary chamber shall not be less than 800 degrees c
Secondary Combustion
The residence time in the secondary chamber shall not be less than 2 seconds
The gas temperature as measured against the inside wall in the secondary chamber ,not in the flame zone shall not be less than as indicated in Lot 1-7
Both the primary and secondary temperatures shall be maintained until all the waste has been completely combusted
Chimney
The chimney shall have a minimum height of 4 metres above ground level
The minimum exit velocity of the emissions shall not be less than 10metres/second
Temperature Warnings
An audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box can be detached and mounted on separate stand of atleast 1.5metres from the incinerator at approximately 1.6 metre height
CE compliant or equivalent for incinerators of this size and model
Drawings and photos for the offered lots
1 year spare parts,fuel tanks and 10metre hose to come standard with every incinerator
Specifications for Mobile Incinerator Units
Trailer mounted mobile incinerator units suitable for the following applications
Medical waste
Domestic waste
Industrial waste
Animal cadavers
CHIMNEY
Heavy-duty stainless steel casing
1.5m length
0.6m refractory lined stack
CONTROL PANEL
Control of 1 burner
Timer control 0- 12 hours
Integral fan timer control
Temperature Monitoring
Thermostatic Control
Automatic Control
Cycle time set up
ANCILLARIES
Operating and maintenance manuals
Spares list
CONTAINERISATION
incinerator fully installed inside of 10 ft ISO certified container
3,5 kwA electricity generator, 1000 litres fuel tank
Incinerator mounted on the silenblock cushion.
Orignal From: Specifications for Double Chamber Incinerator
The Model is for up to 300kgs capacity per batch load and will burn at around 55kgs per hour.
The unit has top loading design and has a heavy duty refractory cement lining for maximum heat retention. Unit have large top lid for easy loading, and specially designed front ash door, for ash removal.
This unit operates at over 1100°C in the primary chamber to ensure complete combustion. This model also benefits
from a heavy duty secondary chamber and burner which ensures a complete re-burn of any smoke and emissions and a 0.5 second gas retention time.
Burn rate 150kg/h minimum
Secondary Chamber Yes
Gas Retention Time 2 seconds
Fuel Diesel/LPG/LNG
Power Supply for Control Box 220V-240V 50Hz single phase
Minimum Operating Temperature 920˚C
PRIMARY CHAMBER
Heavy-duty steel casing
High quality refractory lining and insulation
Large full size top load door and liquid retention sill
1 x diesel oil fired ignition burners operated on/off
SECONDARY CHAMBER
Heavy-duty steel casing
High quality refractory lining and insulation
1 x diesel oil fired ignition burners operated on/off
Specifications for Double Chamber Incinerator:
Primary Combustion
The primary combustion chamber shall be accepted as the primary combustion zone.
The minimum combustion temperature of the primary chamber shall not be less than 800 degrees c
Secondary Combustion
The residence time in the secondary chamber shall not be less than 2 seconds
The gas temperature as measured against the inside wall in the secondary chamber ,not in the flame zone shall not be less than as indicated in Lot 1-7
Both the primary and secondary temperatures shall be maintained until all the waste has been completely combusted
Chimney
The chimney shall have a minimum height of 4 metres above ground level
The minimum exit velocity of the emissions shall not be less than 10metres/second
Temperature Warnings
An audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box can be detached and mounted on separate stand of atleast 1.5metres from the incinerator at approximately 1.6 metre height
CE compliant or equivalent for incinerators of this size and model
Drawings and photos for the offered lots
1 year spare parts,fuel tanks and 10metre hose to come standard with every incinerator
Specifications for Mobile Incinerator Units
Trailer mounted mobile incinerator units suitable for the following applications
Medical waste
Domestic waste
Industrial waste
Animal cadavers
CHIMNEY
Heavy-duty stainless steel casing
1.5m length
0.6m refractory lined stack
CONTROL PANEL
Control of 1 burner
Timer control 0- 12 hours
Integral fan timer control
Temperature Monitoring
Thermostatic Control
Automatic Control
Cycle time set up
ANCILLARIES
Operating and maintenance manuals
Spares list
CONTAINERISATION
incinerator fully installed inside of 10 ft ISO certified container
3,5 kwA electricity generator, 1000 litres fuel tank
Incinerator mounted on the silenblock cushion.
Orignal From: Specifications for Double Chamber Incinerator
Diesel/LPG/LNG burning primary combustion chamber/primary combustion incinerator
Primary combustion
Diesel/LPG/LNG burning primary combustion chamber/primary combustion zone
Secondary combustion
Residence time in the secondary chamber not less than 2 seconds
Both primary and the secondary temperatures maintained until all the waste has been completely combusted
Chimney
Chimney with a minimum height of 4 meters above ground level
Minimum exit velocity of the emissions not less than 10 metres/second
Temperature Warnings
Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter
heightItem 1
Incinerator model A
Burn Rate 65kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years
Item 2
Incinerator model B
Burn Rate 150kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Diesel/LPG/LNG, please indicate
Power Supply for Control Box- 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years
Item 3
Incinerator model C
Burn Rate 250kg/h minimum
Weight (kg) please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years
High Temperature Waste Incinerator
Capacity at least (4000) kg/day ((Day=16 Working Hours))
Capacity at least (4000) kg/day ((Day=24 Working Hours))
With the following features:
*Automatic feeder as original part of the unit.
*Automatic ash / leftovers removal as original part of the unit.
*Water Injection System to control the temperature>
*Flue gas filtration system complying with EU.
*Continuous emission monitoring and recording system.
*It should include installation, testing, and staff training.
*6 nos. of heavy duty loading containers.
Item 4
HTW Incinerator model D
Burn Rate - 150kg/hour minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V, single phase 50-60Hz
Minimum operating temperature 1200°C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Mobile Incinerator
Item 5
Mobile Incinerator model E
Burn Rate 50kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
Mobile Incinerator
Item 6
Mobile Incinerator model F
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years
High Temperature Waste Mobile Incinerator
Item 7
HTW Mobile Incinerator model G
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 1200 °C, please indicate
Primary combustion
Diesel/LPG/LNG burning primary combustion chamber/primary combustion zone
Secondary combustion
Residence time in the secondary chamber not less than 2 seconds
Both primary and the secondary temperatures maintained until all the waste has been completely combusted
Chimney
Chimney with a minimum height of 4 meters above ground level
Minimum exit velocity of the emissions not less than 10 metres/second
Temperature Warnings
Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter
height
Warranty, indicate no of years
Orignal From: Diesel/LPG/LNG burning primary combustion chamber/primary combustion incinerator
Diesel/LPG/LNG burning primary combustion chamber/primary combustion zone
Secondary combustion
Residence time in the secondary chamber not less than 2 seconds
Both primary and the secondary temperatures maintained until all the waste has been completely combusted
Chimney
Chimney with a minimum height of 4 meters above ground level
Minimum exit velocity of the emissions not less than 10 metres/second
Temperature Warnings
Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter
heightItem 1
Incinerator model A
Burn Rate 65kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years
Item 2
Incinerator model B
Burn Rate 150kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Diesel/LPG/LNG, please indicate
Power Supply for Control Box- 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years
Item 3
Incinerator model C
Burn Rate 250kg/h minimum
Weight (kg) please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years
High Temperature Waste Incinerator
Capacity at least (4000) kg/day ((Day=16 Working Hours))
Capacity at least (4000) kg/day ((Day=24 Working Hours))
With the following features:
*Automatic feeder as original part of the unit.
*Automatic ash / leftovers removal as original part of the unit.
*Water Injection System to control the temperature>
*Flue gas filtration system complying with EU.
*Continuous emission monitoring and recording system.
*It should include installation, testing, and staff training.
*6 nos. of heavy duty loading containers.
Item 4
HTW Incinerator model D
Burn Rate - 150kg/hour minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V, single phase 50-60Hz
Minimum operating temperature 1200°C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Mobile Incinerator
Item 5
Mobile Incinerator model E
Burn Rate 50kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
Mobile Incinerator
Item 6
Mobile Incinerator model F
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years
High Temperature Waste Mobile Incinerator
Item 7
HTW Mobile Incinerator model G
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time - 2 Seconds
Fuel - Diesel/LPG/LNG, please indicate
Power Supply for Control Box - 220V-240V 50Hz single phase
Minimum operating temperature 1200 °C, please indicate
Primary combustion
Diesel/LPG/LNG burning primary combustion chamber/primary combustion zone
Secondary combustion
Residence time in the secondary chamber not less than 2 seconds
Both primary and the secondary temperatures maintained until all the waste has been completely combusted
Chimney
Chimney with a minimum height of 4 meters above ground level
Minimum exit velocity of the emissions not less than 10 metres/second
Temperature Warnings
Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter
height
Warranty, indicate no of years
Orignal From: Diesel/LPG/LNG burning primary combustion chamber/primary combustion incinerator
Friday, January 13, 2017
install a diesel fired incinerator
incinerate mainly pharmaceuticals ( all types of dosage forms ... syrups, tablets, injectables ) medical consummabables, and also biological fluids ...
Capacity around 10 kg/ hour. install a diesel fired incinerator that can accommodate a batch load of up to 100 kg with a daily burning requirement of up to 500kg per 8 hour day. Industrial Incinerator to destroy
the pharmaceuticals waste like Alu, PVC,PVDC etc.Installation for burning of animal waste cost, presence, repayment terms where it is possible to buy in Russia? I am looking to for capacity between 200 -400kg
1.2FIELD PAINTING
Perform painting required for surfaces not otherwise specified, and finish painting of items only primed at the factory
1.3FIELD TRAINING
a. Submit [Six] complete copies of operating instructions outlining the step-by-step procedures required for system startup, operation and shutdown. Include in instructions the manufacturer's name, model number, service manual, parts list, and brief description of all equipment and their basic operating features. And [Six] complete copies of maintenance instructions listing routine maintenance procedures, possible breakdowns and repairs, troubleshooting guides, and simplified schematic diagrams for the system as installed.
3.6.Performance
Preheat the incinerator for 4 hours to reach the firing temperature of 982degrees C [1800] degrees F. Weigh and record the total charge weight. Charge the incinerator at the rated burning capacity in kg pounds per hour for a period of [4] hours and operate in accordance with the manufacturer's written instructions. Include in performance testing the operation of the mechanical charging facilities, the incinerator, the air pollution control equipment, the ash
handling equipment, and the operation monitoring facilities. Perform testing full scale for a full- operation cycle, and monitor performance to verify compliance with the contract requirements submit a report on monitoring results. Reduce the waste to a fine ash residue. Follow normal burnout procedure. After the incinerator has cooled, weigh the residue. The weight of the residue shall not exceed 5.0 percent combustible material of the total charge weight.
After clean-out, the incinerator shall not show any evidence of deterioration, such as shagged or spilling refractory, warping of parts, and discolored exterior paint.
•Control
Test the incinerator under actual firing conditions. Verify with testing that all controls function within the maximum and minimum limits for temperature or timing. Simulate actual unsafe conditions such as high temperatures and flame failure by reducing the settings for the activation of limit and safety controls.
•Shell Temperature
Operate the incinerator under normal load conditions for not less than 6 hours. After 6 hours, temperature readings of the outer shell, taken at not less than 5 random locations, shall not exceed the temperature limitation of paragraph furnace construction.
- capacity: 300-400 kg/hour
- Fuel syetem: Dual fuel( both oil and gas)
Orignal From: install a diesel fired incinerator
Capacity around 10 kg/ hour. install a diesel fired incinerator that can accommodate a batch load of up to 100 kg with a daily burning requirement of up to 500kg per 8 hour day. Industrial Incinerator to destroy
the pharmaceuticals waste like Alu, PVC,PVDC etc.Installation for burning of animal waste cost, presence, repayment terms where it is possible to buy in Russia? I am looking to for capacity between 200 -400kg
1.2FIELD PAINTING
Perform painting required for surfaces not otherwise specified, and finish painting of items only primed at the factory
1.3FIELD TRAINING
a. Submit [Six] complete copies of operating instructions outlining the step-by-step procedures required for system startup, operation and shutdown. Include in instructions the manufacturer's name, model number, service manual, parts list, and brief description of all equipment and their basic operating features. And [Six] complete copies of maintenance instructions listing routine maintenance procedures, possible breakdowns and repairs, troubleshooting guides, and simplified schematic diagrams for the system as installed.
3.6.Performance
Preheat the incinerator for 4 hours to reach the firing temperature of 982degrees C [1800] degrees F. Weigh and record the total charge weight. Charge the incinerator at the rated burning capacity in kg pounds per hour for a period of [4] hours and operate in accordance with the manufacturer's written instructions. Include in performance testing the operation of the mechanical charging facilities, the incinerator, the air pollution control equipment, the ash
handling equipment, and the operation monitoring facilities. Perform testing full scale for a full- operation cycle, and monitor performance to verify compliance with the contract requirements submit a report on monitoring results. Reduce the waste to a fine ash residue. Follow normal burnout procedure. After the incinerator has cooled, weigh the residue. The weight of the residue shall not exceed 5.0 percent combustible material of the total charge weight.
After clean-out, the incinerator shall not show any evidence of deterioration, such as shagged or spilling refractory, warping of parts, and discolored exterior paint.
•Control
Test the incinerator under actual firing conditions. Verify with testing that all controls function within the maximum and minimum limits for temperature or timing. Simulate actual unsafe conditions such as high temperatures and flame failure by reducing the settings for the activation of limit and safety controls.
•Shell Temperature
Operate the incinerator under normal load conditions for not less than 6 hours. After 6 hours, temperature readings of the outer shell, taken at not less than 5 random locations, shall not exceed the temperature limitation of paragraph furnace construction.
- capacity: 300-400 kg/hour
- Fuel syetem: Dual fuel( both oil and gas)
Orignal From: install a diesel fired incinerator
BIOHAZARD DISPOSAL INCINERATOR CONTAINERISED IN A 20 FT CONTAINER
BIOHAZARD DISPOSAL: CONTAINER
GENERAL INCINERATOR, IDEAL FOR INCINERATION OF VARIOUS TYPES OF WASTE, FULLY CONTAINERISED IN A 20 FT CONTAINER, TO INCLUDE BUILT-IN FUEL TANK AND GENERATOR.
TECHNICAL SPECIFICATIONS: COMBUSTION CHAMBER VOLUME (M3); 0.54 m3. SUGGESTED BATCH SIZE: 60 KG, BURN RATE: 69 KG PER HOUR, AVERAGE FUEL CONSUMPTION 13 KG PER HOUR, OPERATIONAL TEMPERATURE: 950-1320 CELSIUS, GAS RETENTION IN SECONDARY CHAMBER 0.5 SECS, WITH TEMP. MONITORING , AVERAGE ASH RESIDUE: 3%, THERMOSTATIC DEVICE: YES,
DIMENSIONS: EXTERNAL LENGTH (mm): 1520MM, EXTERNAL WIDTH (mm): 920MM, EXTERNAL HEIGHT (mm): 4020 MM
1. Incinerator for Bio-Medical Waste incineration needed
2. 50 kg/hr
3. 2 chambers must be there
4. temperature of primary chamber should be 850 degrees Celsius
temperature of secondary chamber should be 1200 degrees Celsius
Orignal From: BIOHAZARD DISPOSAL INCINERATOR CONTAINERISED IN A 20 FT CONTAINER
GENERAL INCINERATOR, IDEAL FOR INCINERATION OF VARIOUS TYPES OF WASTE, FULLY CONTAINERISED IN A 20 FT CONTAINER, TO INCLUDE BUILT-IN FUEL TANK AND GENERATOR.
TECHNICAL SPECIFICATIONS: COMBUSTION CHAMBER VOLUME (M3); 0.54 m3. SUGGESTED BATCH SIZE: 60 KG, BURN RATE: 69 KG PER HOUR, AVERAGE FUEL CONSUMPTION 13 KG PER HOUR, OPERATIONAL TEMPERATURE: 950-1320 CELSIUS, GAS RETENTION IN SECONDARY CHAMBER 0.5 SECS, WITH TEMP. MONITORING , AVERAGE ASH RESIDUE: 3%, THERMOSTATIC DEVICE: YES,
DIMENSIONS: EXTERNAL LENGTH (mm): 1520MM, EXTERNAL WIDTH (mm): 920MM, EXTERNAL HEIGHT (mm): 4020 MM
1. Incinerator for Bio-Medical Waste incineration needed
2. 50 kg/hr
3. 2 chambers must be there
4. temperature of primary chamber should be 850 degrees Celsius
temperature of secondary chamber should be 1200 degrees Celsius
Orignal From: BIOHAZARD DISPOSAL INCINERATOR CONTAINERISED IN A 20 FT CONTAINER
Thursday, January 12, 2017
an animal cremator
an animal cremator for our business in malaysia.currently we are doing individual private cremation and mass cremation for pets as well as medical waste.an incinerator which is capable of burning between 3 to 5 tonnes per day of mixed waste products, plastics, rubber, flammable putrescible waste, medical waste, rubber tyres, paper and cardboard, textiles, green timber waste etc. As some of the waste products will contain non-flammable solids, the incinerator should be capable of extracting those materials probably via a rotary kiln process.
It is not intended to use any fuel, such as oil or diesel, to promote the burning of the waste, as the waste products are required to be incinerated using a free burning process. Hot air however from a downstream process will be available to increase the incinerator temperature and burning rate as required. Very high temperatures in the incinerator are not necessary and are not required.
The burning of the waste products is expected to produce toxic emissions which will be cleaned via other existing downstream processes and a Post Combustion process in the incinerator is therefore not required.
The incinerator should be capable of accommodating an automatic waste feed process.Incinerator Specification
S. No.
Description
1
Feeding Capacity
100 Kg.
2
Burning Capacity
50 Kg. / Hour
3
Feed Mode
Manual
4
Fuel
Diesel Oil
5
Incinerator Type
Dual Combustion Chamber with Built in Smoke Filter ( Dry Scrubber )
6
Chimney Material
Non Corrosive / Corrosion Resistant Preferably Stainless for longer Life (Height 5-7 Meter)
7
Burners
High Quality European CE Certified Oil Burner
8
Control Panel
Standard PLC Control Panel
9
Power Supply
220/380 Volt Ac 50 Hz.
10
Oil Tank Capacity
200~~ 300 Litre
11
Burning Chamber
Fire Brick, Refractoy Brick, Concrete
Orignal From: an animal cremator
It is not intended to use any fuel, such as oil or diesel, to promote the burning of the waste, as the waste products are required to be incinerated using a free burning process. Hot air however from a downstream process will be available to increase the incinerator temperature and burning rate as required. Very high temperatures in the incinerator are not necessary and are not required.
The burning of the waste products is expected to produce toxic emissions which will be cleaned via other existing downstream processes and a Post Combustion process in the incinerator is therefore not required.
The incinerator should be capable of accommodating an automatic waste feed process.Incinerator Specification
S. No.
Description
1
Feeding Capacity
100 Kg.
2
Burning Capacity
50 Kg. / Hour
3
Feed Mode
Manual
4
Fuel
Diesel Oil
5
Incinerator Type
Dual Combustion Chamber with Built in Smoke Filter ( Dry Scrubber )
6
Chimney Material
Non Corrosive / Corrosion Resistant Preferably Stainless for longer Life (Height 5-7 Meter)
7
Burners
High Quality European CE Certified Oil Burner
8
Control Panel
Standard PLC Control Panel
9
Power Supply
220/380 Volt Ac 50 Hz.
10
Oil Tank Capacity
200~~ 300 Litre
11
Burning Chamber
Fire Brick, Refractoy Brick, Concrete
Orignal From: an animal cremator
incinerate biohazard waste
an incinerator which is capable of burning between 3 to 5 tonnes per day of mixed waste products, plastics, rubber, flammable putrescible waste, medical waste, rubber tyres, paper and cardboard, textiles, green timber waste etc. As some of the waste products will contain non-flammable solids, the incinerator should be capable of extracting those materials probably via a rotary kiln process. We are however open to suggestions on the issue of the rotary kiln solution as you may have other solutions available.
It is not intended to use any fuel, such as oil or diesel, to promote the burning of the waste, as the waste products are required to be incinerated using a free burning process. Hot air however from a downstream process will be available to increase the incinerator temperature and burning rate as required. Very high temperatures in the incinerator are not necessary and are not required.
The burning of the waste products is expected to produce toxic emissions which will be cleaned via other existing downstream processes and a Post Combustion process in the incinerator is therefore not required.
The incinerator should be capable of accommodating an automatic waste feed process.We are looking for incinerator to incinerate biohazard waste of our microbiology lab. Our daily waste production is upto 20 Kg maximum and incinerator will be required on weekly basis that is 1 or 2 times a week so you are therefore requested to kindly suggest the appropriate incinerator for our lab which shall be cost effective for us regarding purchasing and maintenance cost.
Orignal From: incinerate biohazard waste
It is not intended to use any fuel, such as oil or diesel, to promote the burning of the waste, as the waste products are required to be incinerated using a free burning process. Hot air however from a downstream process will be available to increase the incinerator temperature and burning rate as required. Very high temperatures in the incinerator are not necessary and are not required.
The burning of the waste products is expected to produce toxic emissions which will be cleaned via other existing downstream processes and a Post Combustion process in the incinerator is therefore not required.
The incinerator should be capable of accommodating an automatic waste feed process.We are looking for incinerator to incinerate biohazard waste of our microbiology lab. Our daily waste production is upto 20 Kg maximum and incinerator will be required on weekly basis that is 1 or 2 times a week so you are therefore requested to kindly suggest the appropriate incinerator for our lab which shall be cost effective for us regarding purchasing and maintenance cost.
Orignal From: incinerate biohazard waste
Solid Waste Incinerators
The Contractor shall provide a Cremation System package for TWO (02) Cremators and system approved by related authority, which must fit into the allocated area as shown on the plan drawings. The work shall include but not limited to design preparation, authority design approval, supply, fabricate, construct, commissioning, testing, operational approval, provide training and also warranty of the system package. The work shall include all preliminaries, related civil and structural work, mechanical and electrical work and all external work required for the proper completion and operational of the system and as follows :The incinerator will be used for a group of private multi profile hospitals.
The hourly-generated waste is about 100kg per hour, but with 1000kg daily amount.
Due to the economic situation in Bulgaria now, our researches shows that a 100kg/hour system can fit the needs set in the project.
Please, offer us an Incinerator system that can match the parameters described above. We are ready to give information that is more detailed if you need such one. Within the technical specifications of you product we need to have full details of the parameters of exhaust gases, with all certificates you have about the environmental safety regarding EU directives.
1. All preliminaries which shall include but not limited to providing work insurances, taxes, mobilisation and demobilisation, contract management and supervision, design and professional fee, authority design approval, operational approval, site preparation, temporary storage, health environmental safety and security, setting out, CIDB levy, duties, deposits, fees, charges, contribution but not excluding only the bank guarantee to the authority JPP which shall be provided by the Client, progress reporting and other required preliminaries for successful completion of the work.This type of incinerator is what you have described as a 'low temperature thermal decomposition incinerator'. We can speed up the burning process by using hot air from a downstream process which can be fed back into the incinerator to raise the burning temperature.
considerably. These kinds of incinerators are the sort that would probably have been made and used many years ago before the anti pollution regulations were brought in. We believe that they would be very simple and cheap to manufacture for a company such as yours, as long as a large sales volume could be obtained. We believe that our technology will create a large need for this type of incinerator and would also make a good business opportunity for a company, such as Clover, who is able and willing to manufacture and supply them. I am sure that this simple type of incinerator could be easily modified to enable automatic charging and probably also automatic cleaning?
2. All structural, building and architectural work which includes but not limited to construction of all reinforced concrete work, chimney, structural steel work and all building work for all necessary requirements, operational and control panel system for proper completion and successful operation of the syste. The Contractor must make good all the works being disturbed.We want a very simple, single combustion chamber, incinerator which is capable of burning all types of waste and rubbish products. We will be treating the emissions from the incinerator in another process so we do not have to have scrubbing or other cleaning equipment to avoid pollution.
The incinerator is required to operate 24/7 continuously so it needs to be able to be cleaned whilst still operating. The waste materials being burned will contain non flammable materials and these will need to be cleared out of the incinerator. We would like this cleaning to be as simple as possible. The same applies to the loading of rubbish into the incinerator, which we would like to be able to be done automatically if possible.
3. All mechanical and eletrical works which includes but limited to supply, deliver and installation of all valves, penstock, screens, pumps, float swithces, flexible connector, pressure pipe works, blower, hot dipped galvanised lifting davits, air diffusers, hot dipped galvanised handrailings, hot dipped galvanised gratings, switch boards, cabling and wirings, lighting, earthing, metering, lighting protection, flow measurement and flow recorders, testing & comissioning and all necessary for proper completion and successful operational of the system.
TOTAL CARRIED TO COLLECTION
Design and Build approved gas cremation system
(Cont'd)
4. The Contractor shall provide and fully comply with all requirements by the related authority during design stage, design approval, inspection and after inspection, handing over of the system package whether it is clearly shown or not but deemed necessary for successful completion and satisfaction to the authority. The Contractor must allow in his tender price all direct and indirect cost at no extra cost to the Client for all such compliances.7. Type of waste : Bio-medical / Hazardous / Municipal / Trash = ALL and Mixed
8. Any other : Rubber, rubber tyres, Batteries, green waste, paper and cardboard
9. Quantity of waste generated per day in kg : 3 -5 tonnes per day
10. Duration – incinerator will be used per day : 1 – 8 hours / 1 – 16 hours / Continuous
11. Approximate moisture content: Variable
12. Local incinerator operating and emission standards : India / EURO / US-EPA Australia
13. What is the height of the chimney required? : No chimney is required. Flue length should be approximately 2 to 3 metres to join to a downstream process
14. Fuel proposed to be used : LDO / HSD / FO / SKO/ Gas / Other - No fuel required - Intended to free burn waste products
15. Availability of power and type : Electricity if required
16. Details of space available : Not restricted
17. Do you require an automatic loading system? : [X ] Yes [ ] No
18. Do you require a gas scrubbing system? : [ ] Yes [X ] No
19. How soon do you require the system to be delivered? : Sea Freight to Port of Cairns, Queensland, Australia in approximately Two months
20. City and country of use : Australia
21. Whether the location is a coastal area : [ ]Yes [X ] No
22. Any other specific requirements: Primary combustion chamber only is required. Solid and inflammable waste products need to be capable of being recovered from the incinerator easily using an automated procedure. This is because the incinerator will be required to operate 24/7. Rotary kiln or moving floor may be considered if deemed practical by the supplier. One initial incinerator is required for a proof of concept project and future orders for the successful supplier, following successful implementation of this project, are likely to be significant.
23. It would be most useful if the supplier could send a video of the incinerator in operation or diagrams and pictures to show how it works.
5. The Contractor shall be responsible for all maintenance of the system, routine and periodical maintenance such as cleaning etc. during, upon completion, before and after inspection. The maintenance shall be in fully compliance to the authority requirements and satisfaction and shall be deemed included in the Contractor tender price and at no extra cost to the Client.
6. The Contractor must submit to the S.O their proposed system package detail, which includes authority approval and an A4 or A3 preliminary dimensioned system layout fitting into area allocated in the plan drawing.
7. For maintenance and services during Defect Liability Period, respond period to any complaint for the Contractor to attend shall be within 24hours
8. The Cremators package shall, inter alia, inclusive the following scope:
- Furnace Chamber and Afterburner
- Combustion System
- Control Panel
- Single refactory lined chimney for 2 cremators
- Flue Gas Sampling Platform
- Electrical wiring within the system requirements
- Raking Tools
- Ashbox
- Approval from DOE / Local Authority
- Any other scope/works required for the systems
Orignal From: Solid Waste Incinerators
The hourly-generated waste is about 100kg per hour, but with 1000kg daily amount.
Due to the economic situation in Bulgaria now, our researches shows that a 100kg/hour system can fit the needs set in the project.
Please, offer us an Incinerator system that can match the parameters described above. We are ready to give information that is more detailed if you need such one. Within the technical specifications of you product we need to have full details of the parameters of exhaust gases, with all certificates you have about the environmental safety regarding EU directives.
1. All preliminaries which shall include but not limited to providing work insurances, taxes, mobilisation and demobilisation, contract management and supervision, design and professional fee, authority design approval, operational approval, site preparation, temporary storage, health environmental safety and security, setting out, CIDB levy, duties, deposits, fees, charges, contribution but not excluding only the bank guarantee to the authority JPP which shall be provided by the Client, progress reporting and other required preliminaries for successful completion of the work.This type of incinerator is what you have described as a 'low temperature thermal decomposition incinerator'. We can speed up the burning process by using hot air from a downstream process which can be fed back into the incinerator to raise the burning temperature.
considerably. These kinds of incinerators are the sort that would probably have been made and used many years ago before the anti pollution regulations were brought in. We believe that they would be very simple and cheap to manufacture for a company such as yours, as long as a large sales volume could be obtained. We believe that our technology will create a large need for this type of incinerator and would also make a good business opportunity for a company, such as Clover, who is able and willing to manufacture and supply them. I am sure that this simple type of incinerator could be easily modified to enable automatic charging and probably also automatic cleaning?
2. All structural, building and architectural work which includes but not limited to construction of all reinforced concrete work, chimney, structural steel work and all building work for all necessary requirements, operational and control panel system for proper completion and successful operation of the syste. The Contractor must make good all the works being disturbed.We want a very simple, single combustion chamber, incinerator which is capable of burning all types of waste and rubbish products. We will be treating the emissions from the incinerator in another process so we do not have to have scrubbing or other cleaning equipment to avoid pollution.
The incinerator is required to operate 24/7 continuously so it needs to be able to be cleaned whilst still operating. The waste materials being burned will contain non flammable materials and these will need to be cleared out of the incinerator. We would like this cleaning to be as simple as possible. The same applies to the loading of rubbish into the incinerator, which we would like to be able to be done automatically if possible.
3. All mechanical and eletrical works which includes but limited to supply, deliver and installation of all valves, penstock, screens, pumps, float swithces, flexible connector, pressure pipe works, blower, hot dipped galvanised lifting davits, air diffusers, hot dipped galvanised handrailings, hot dipped galvanised gratings, switch boards, cabling and wirings, lighting, earthing, metering, lighting protection, flow measurement and flow recorders, testing & comissioning and all necessary for proper completion and successful operational of the system.
TOTAL CARRIED TO COLLECTION
Design and Build approved gas cremation system
(Cont'd)
4. The Contractor shall provide and fully comply with all requirements by the related authority during design stage, design approval, inspection and after inspection, handing over of the system package whether it is clearly shown or not but deemed necessary for successful completion and satisfaction to the authority. The Contractor must allow in his tender price all direct and indirect cost at no extra cost to the Client for all such compliances.7. Type of waste : Bio-medical / Hazardous / Municipal / Trash = ALL and Mixed
8. Any other : Rubber, rubber tyres, Batteries, green waste, paper and cardboard
9. Quantity of waste generated per day in kg : 3 -5 tonnes per day
10. Duration – incinerator will be used per day : 1 – 8 hours / 1 – 16 hours / Continuous
11. Approximate moisture content: Variable
12. Local incinerator operating and emission standards : India / EURO / US-EPA Australia
13. What is the height of the chimney required? : No chimney is required. Flue length should be approximately 2 to 3 metres to join to a downstream process
14. Fuel proposed to be used : LDO / HSD / FO / SKO/ Gas / Other - No fuel required - Intended to free burn waste products
15. Availability of power and type : Electricity if required
16. Details of space available : Not restricted
17. Do you require an automatic loading system? : [X ] Yes [ ] No
18. Do you require a gas scrubbing system? : [ ] Yes [X ] No
19. How soon do you require the system to be delivered? : Sea Freight to Port of Cairns, Queensland, Australia in approximately Two months
20. City and country of use : Australia
21. Whether the location is a coastal area : [ ]Yes [X ] No
22. Any other specific requirements: Primary combustion chamber only is required. Solid and inflammable waste products need to be capable of being recovered from the incinerator easily using an automated procedure. This is because the incinerator will be required to operate 24/7. Rotary kiln or moving floor may be considered if deemed practical by the supplier. One initial incinerator is required for a proof of concept project and future orders for the successful supplier, following successful implementation of this project, are likely to be significant.
23. It would be most useful if the supplier could send a video of the incinerator in operation or diagrams and pictures to show how it works.
5. The Contractor shall be responsible for all maintenance of the system, routine and periodical maintenance such as cleaning etc. during, upon completion, before and after inspection. The maintenance shall be in fully compliance to the authority requirements and satisfaction and shall be deemed included in the Contractor tender price and at no extra cost to the Client.
6. The Contractor must submit to the S.O their proposed system package detail, which includes authority approval and an A4 or A3 preliminary dimensioned system layout fitting into area allocated in the plan drawing.
7. For maintenance and services during Defect Liability Period, respond period to any complaint for the Contractor to attend shall be within 24hours
8. The Cremators package shall, inter alia, inclusive the following scope:
- Furnace Chamber and Afterburner
- Combustion System
- Control Panel
- Single refactory lined chimney for 2 cremators
- Flue Gas Sampling Platform
- Electrical wiring within the system requirements
- Raking Tools
- Ashbox
- Approval from DOE / Local Authority
- Any other scope/works required for the systems
Orignal From: Solid Waste Incinerators
Tuesday, January 10, 2017
incinerators that can handle Bio-Medical waste red bag
incinerators that can handle Bio-Medical waste (red bag) from research laboratories with level 2 and 3, animal research, and hospitals. There are also a small amount of Pharmaceutical waste to be destroyed. I would like your recommendations on what incinerators would handle the these requirement based on the following monthly kilograms of material.
Site 1 – 4,650Kgs per month (I have recommend that I install two incinerators at this location since it is a medical research facility and the usage is very high)
Site 2 – 1000Kgs per month (this facility deals more with animal research but also has red bag waste from their research side, they currently have a large animal carouse incinerator)
Site 3 – 1000Kgs per month (this facility is a local hospital with bio-waste from treating patients)
Orignal From: incinerators that can handle Bio-Medical waste red bag
Site 1 – 4,650Kgs per month (I have recommend that I install two incinerators at this location since it is a medical research facility and the usage is very high)
Site 2 – 1000Kgs per month (this facility deals more with animal research but also has red bag waste from their research side, they currently have a large animal carouse incinerator)
Site 3 – 1000Kgs per month (this facility is a local hospital with bio-waste from treating patients)
Orignal From: incinerators that can handle Bio-Medical waste red bag
Monday, January 9, 2017
Biomedical Waste Incinerator, 10-15 KG
The first is a small
20kg/per hr incinerator for a small-medium sized hospital, and the
second is a 500kg per/hr incinerator for a company planning to start a
incineration service in Lahore.Burn Rate : >200 kg per hour
Average fuel consumption : ~29 kg per hour ( Or lesser)
Gas Retention in Secondary Chamber : 2 secs
Temperature Monitoring : Yes
Average Ash Residue : 3%Medical waste management practises here are sub-standard. I have come across your small scale medical waste management units.Biomedical Waste Incinerator, 10-15 kg
Manufacturer:
Brand:
Type / Model:
Country of Origin:
Description of Function
The Biomedical Waste Incinerator is used for Incineration of each type of Biomedical Waste.
The Disposal of such Biomedical waste is a very important as it is a dangerous wastes for
human life, and It is only possible with a perfect incinerator.
Operational Requirements
It shall be operated by manual and automated mode.
The combustion efficiency (CE) shall be at least 99.00%.
The combustion efficiency is computed as follows:
C.E.= __%CO2______ x 100
%CO2 + %CO
Emission Standards: Lower emission rates are preferred.
Parameters Concentration in mg/Nm3 (12% CO2 correction
Max total dust 30mg/m3
Max Sulphur Dioxide 200mg/m3
Max Nitrogen dioxide 400mg/m3
Max Carbon 100mg/m3
Monoxide
Minimum stack height shall be 30 metres above ground.
Volatile organic compounds in ash shall not be more than 0.01%.
System Configuration
Biomedical Waste Incinerator, complete unit.
Technical Specifications
Incinerator:
It shall be Electrical or Diesel Fired Incinerator or Controlled Air & pyrolytic.
Type of Waste: Biomedical Waste
It shall have burning capacity 10-15 kg/hr.
Fuel: Diesel
Burner: Monoblock fully automatic burners.
Temperature: Primary Chamber 800 ± 50 oC, Secondary Chamber 1050 ± 50 oC.
Type of Waste: Biomedical waste with moisture content up to 85%.
Destruction Efficiency: 99%.
It shall have separate digital display of temperature for both chambers.
It shall have provision for measuring primary & secondary chamber temperatures using external
thermo coupler.
Secondary chamber gas residence time shall be minimum 1 second at 1050 oC.
Primary Chamber:
Type: Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC
Insulation thickness: approx.115mm thick
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Ash Removal: Manual/automatic
Secondary Chamber:
Type : Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC.
Insulation thickness: approx.115mm
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Emergency Stack:
Type: cylindrical, top mounted on venturi ejector.
Material of Construction: Mild Steel, 3mm thick.
Refractory: 75mm thick castable.
Insulation: 25mm thick castable.
Quencher:
Material of construction of outer body: Mild Steel refractory lined from inside.
Shall have water circulation system with centrifugal pump.
It shall have to reduce flue gas temperature before venturi scrubber.
Shall provide pump motor of suitable capacity.
Air Pollution Control Device – Venturi Scrubber
Type: High pressure jet type.
MOC: Stainless steel – 316L.
Temperature at the outlet: 78-80 oC
Scrubbing Media: Water with 5% caustic
Re- Circulation Pump for Venturi Scrubber
Type: Centrifugal
Application: PP/SS
Piping : PPR
Droplet Separator & Re-Circulation Tank (Integral)
Type: Cyclonic
Application: To separate water droplets from flue gases
Material of Construction: Mild Steel Rubber lined 3mm thick
I.D. Fan:
Type: High pressure centrifugal
Material of Construction: Stainless steel 304, impeller and mild steel rubber lined casting
Drive: Bel
Combustion Fan:
Type: Centrifugal
Modulation: Manual damper control
Material of Construction: Mild Steel
Drive: Direct drive
Burners:
No. of burners: 2 Nos. (1 No. in Primary Chamber and 1No. in Secondary Chamber)
Type: Monoblock fully automatic
Fuel: Diesel
Fuel Oil Storage Tank:
Shall provide suitable capacity of oil storage tank.
Material of Construction: Mild steel.
Facility for visual checking of fuel shall be there.
It shall have diesel consumption monitoring system.
It shall come with diesel oil level indicator, piping with valves & N.R. valve.
Control Panel:
Type: Manual & Automated PLC based control panel with printer & recording device.
Material of Construction: CRCA sheet
It shall have digital temperature controller.
Epoxy powder coated washable paint finish.
It shall have audio-visual alarm system.
Chimney of 30 meters Height:
Material of Construction: Mild Steel
It shall be self-supporting type.
Height shall be 30 meters from ground level.
Paint The chimney is painted externally with two coats of heat resistant aluminum paint
Shall provide ladder till the top.
It shall have 3mm thick rubber lining from inside for protection.
It shall come with aviation lamp, lightening arrestor, stack, drain, inspection platform, sampling
port.
Consumption certificate:
The bidder must submit diesel consumption for a daily operation of 6 hours.
Turnkey:
Prices offered shall be inclusive of all civil works, electrical requirements including cabling and
switches required for installation & commissioning of the equipment.
Bidder shall submit detail drawings, design, and layout plan of civil works.
The bidder shall submit the details of BOQ of civil and electrical works.
Accessories, spares and consumables
All standard accessories, consumables and parts required to operate the equipment, including
all standard tools and cleaning and lubrication materials, to be included in the offer. Bidders
must specify the quantity of every item included in their offer (including items not specified
above).
Operating Environment
The system offered shall be designed to store and to operate normally under the conditions of
the purchaser's country. The conditions include Power Supply, Climate, Temperature,
Humidity, etc.
Power supply: 220-240 VAC, 50Hz single phase/400 – 420 VAC, 50Hz three phase as
appropriate fitted with appropriate plug. The power cable must be at least 3 meter in length.
Standards and Safety Requirements
It shall have approval of "Pollution Control Board" of purchaser's country.
All mandatory approvals required for the installation and operation of incinerator shall be done
by the bidder.
Must submit ISO 9001 AND
CE or USFDA approved product certificate.
User Training
Must provide user training (including how to use and maintain the equipment).
Warranty
Comprehensive warranty for 2 years after acceptance.
Maintenance Service during Warranty Period
During the warranty period supplier must ensure preventive maintenance along with
corrective/breakdown maintenance whenever required.
Installation and Commissioning
The bidder must arrange for the equipment to be installed and commissioned by certified or
qualified personnel; any prerequisites for installation to be communicated to the purchaser in
advance, in detail.
Documentation
User (Operating) manual in English.
Service (Technical / Maintenance) manual in English
List of important spare parts and accessories with their part number and costing.
Certificate of calibration and inspection from factory.
Orignal From: Biomedical Waste Incinerator, 10-15 KG
20kg/per hr incinerator for a small-medium sized hospital, and the
second is a 500kg per/hr incinerator for a company planning to start a
incineration service in Lahore.Burn Rate : >200 kg per hour
Average fuel consumption : ~29 kg per hour ( Or lesser)
Gas Retention in Secondary Chamber : 2 secs
Temperature Monitoring : Yes
Average Ash Residue : 3%Medical waste management practises here are sub-standard. I have come across your small scale medical waste management units.Biomedical Waste Incinerator, 10-15 kg
Manufacturer:
Brand:
Type / Model:
Country of Origin:
Description of Function
The Biomedical Waste Incinerator is used for Incineration of each type of Biomedical Waste.
The Disposal of such Biomedical waste is a very important as it is a dangerous wastes for
human life, and It is only possible with a perfect incinerator.
Operational Requirements
It shall be operated by manual and automated mode.
The combustion efficiency (CE) shall be at least 99.00%.
The combustion efficiency is computed as follows:
C.E.= __%CO2______ x 100
%CO2 + %CO
Emission Standards: Lower emission rates are preferred.
Parameters Concentration in mg/Nm3 (12% CO2 correction
Max total dust 30mg/m3
Max Sulphur Dioxide 200mg/m3
Max Nitrogen dioxide 400mg/m3
Max Carbon 100mg/m3
Monoxide
Minimum stack height shall be 30 metres above ground.
Volatile organic compounds in ash shall not be more than 0.01%.
System Configuration
Biomedical Waste Incinerator, complete unit.
Technical Specifications
Incinerator:
It shall be Electrical or Diesel Fired Incinerator or Controlled Air & pyrolytic.
Type of Waste: Biomedical Waste
It shall have burning capacity 10-15 kg/hr.
Fuel: Diesel
Burner: Monoblock fully automatic burners.
Temperature: Primary Chamber 800 ± 50 oC, Secondary Chamber 1050 ± 50 oC.
Type of Waste: Biomedical waste with moisture content up to 85%.
Destruction Efficiency: 99%.
It shall have separate digital display of temperature for both chambers.
It shall have provision for measuring primary & secondary chamber temperatures using external
thermo coupler.
Secondary chamber gas residence time shall be minimum 1 second at 1050 oC.
Primary Chamber:
Type: Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC
Insulation thickness: approx.115mm thick
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Ash Removal: Manual/automatic
Secondary Chamber:
Type : Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC.
Insulation thickness: approx.115mm
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Emergency Stack:
Type: cylindrical, top mounted on venturi ejector.
Material of Construction: Mild Steel, 3mm thick.
Refractory: 75mm thick castable.
Insulation: 25mm thick castable.
Quencher:
Material of construction of outer body: Mild Steel refractory lined from inside.
Shall have water circulation system with centrifugal pump.
It shall have to reduce flue gas temperature before venturi scrubber.
Shall provide pump motor of suitable capacity.
Air Pollution Control Device – Venturi Scrubber
Type: High pressure jet type.
MOC: Stainless steel – 316L.
Temperature at the outlet: 78-80 oC
Scrubbing Media: Water with 5% caustic
Re- Circulation Pump for Venturi Scrubber
Type: Centrifugal
Application: PP/SS
Piping : PPR
Droplet Separator & Re-Circulation Tank (Integral)
Type: Cyclonic
Application: To separate water droplets from flue gases
Material of Construction: Mild Steel Rubber lined 3mm thick
I.D. Fan:
Type: High pressure centrifugal
Material of Construction: Stainless steel 304, impeller and mild steel rubber lined casting
Drive: Bel
Combustion Fan:
Type: Centrifugal
Modulation: Manual damper control
Material of Construction: Mild Steel
Drive: Direct drive
Burners:
No. of burners: 2 Nos. (1 No. in Primary Chamber and 1No. in Secondary Chamber)
Type: Monoblock fully automatic
Fuel: Diesel
Fuel Oil Storage Tank:
Shall provide suitable capacity of oil storage tank.
Material of Construction: Mild steel.
Facility for visual checking of fuel shall be there.
It shall have diesel consumption monitoring system.
It shall come with diesel oil level indicator, piping with valves & N.R. valve.
Control Panel:
Type: Manual & Automated PLC based control panel with printer & recording device.
Material of Construction: CRCA sheet
It shall have digital temperature controller.
Epoxy powder coated washable paint finish.
It shall have audio-visual alarm system.
Chimney of 30 meters Height:
Material of Construction: Mild Steel
It shall be self-supporting type.
Height shall be 30 meters from ground level.
Paint The chimney is painted externally with two coats of heat resistant aluminum paint
Shall provide ladder till the top.
It shall have 3mm thick rubber lining from inside for protection.
It shall come with aviation lamp, lightening arrestor, stack, drain, inspection platform, sampling
port.
Consumption certificate:
The bidder must submit diesel consumption for a daily operation of 6 hours.
Turnkey:
Prices offered shall be inclusive of all civil works, electrical requirements including cabling and
switches required for installation & commissioning of the equipment.
Bidder shall submit detail drawings, design, and layout plan of civil works.
The bidder shall submit the details of BOQ of civil and electrical works.
Accessories, spares and consumables
All standard accessories, consumables and parts required to operate the equipment, including
all standard tools and cleaning and lubrication materials, to be included in the offer. Bidders
must specify the quantity of every item included in their offer (including items not specified
above).
Operating Environment
The system offered shall be designed to store and to operate normally under the conditions of
the purchaser's country. The conditions include Power Supply, Climate, Temperature,
Humidity, etc.
Power supply: 220-240 VAC, 50Hz single phase/400 – 420 VAC, 50Hz three phase as
appropriate fitted with appropriate plug. The power cable must be at least 3 meter in length.
Standards and Safety Requirements
It shall have approval of "Pollution Control Board" of purchaser's country.
All mandatory approvals required for the installation and operation of incinerator shall be done
by the bidder.
Must submit ISO 9001 AND
CE or USFDA approved product certificate.
User Training
Must provide user training (including how to use and maintain the equipment).
Warranty
Comprehensive warranty for 2 years after acceptance.
Maintenance Service during Warranty Period
During the warranty period supplier must ensure preventive maintenance along with
corrective/breakdown maintenance whenever required.
Installation and Commissioning
The bidder must arrange for the equipment to be installed and commissioned by certified or
qualified personnel; any prerequisites for installation to be communicated to the purchaser in
advance, in detail.
Documentation
User (Operating) manual in English.
Service (Technical / Maintenance) manual in English
List of important spare parts and accessories with their part number and costing.
Certificate of calibration and inspection from factory.
Orignal From: Biomedical Waste Incinerator, 10-15 KG
HIGH TECH PYROLYTIC MEDICAL WASTE INCINERATOR
HIGH TECH PYROLYTIC MEDICAL WASTE INCINERATOR
1. Capacity of destruction in weight: 60 Kg/h.
2. It should be able to operate not less than 10 hours/day
3. This incinerator must be able to destruct all combustible wastes produced by hospitals,
private clinics, laboratories, institutes, etc...
4. Design Specification : Types A, B, C, D, and E of medical waste
5. PYROLYTIC" combustion, by controlling the gasification of waste.
6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the
loadings.
7. It should be able to reduce the volume of wastes by 98%.
8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.
9. The incineration should be completely free from visible smoke as well as offensive odours.
10. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
• The Temperatures of combustion: Minimum will be 850°C and max 1400°C
• Post combustion: > 1100°C.
11. The Internal diameter of the Chimney: Ø 400 and its height: 8 m
12. The Volume of the combustion chamber: 1.200 L
13. The Dimension of the door for loading in cm: 70x70.
14. Burner operation should be Automatic On/Off
15. Fuel: diesel
16. The supplier must provide necessary information for the best of the installation This incinerator
with "PYROLYTIC" combustion must have:
17. A combustion chamber of waste:
* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch
Load
* A burner of lighting which the use is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and
stuffing insulating out of refractor.-.
* The insulation of the combustion chamber should be composed of refractory bricks,
having a high content of aluminium and insulates bricks in order to assure a minimum
temperature on the outside sheet metal.
* Composition of the refractory;
• Refractory concrete:
> Thickness: > 100 mm "
> Nature: 42% of A1203
• Insulate in fibrous panels :
> Thickness: > 75 mm
> Nature: Calcium silicate.
* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging
flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice
gate of regulation and isolating valve.
* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.
18. A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total recombustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
• Refractory concrete :
> Thickness: > 150 mm
> Nature: 65% of A1203
• Insulate in fibrous panel:
> Thickness: > 85 mm
> Nature: Calcium
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of
electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating
valve.
* A secondary injection of air to ensure perfect oxygen content.
19. A control box ensuring the complete cycle of combustion.
20. Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being
carried out by valves and following the control of the automatic cycle.
21. Controls and regulations:
Control box watertight to dust, including:
* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion,
* A regulator with digital watching for the temperature of postcombustion.
* Electric box.
21. The de- ashing must be done in the bottom of the combustion chamber or the deashing
should be Automatic or manual batch de ashing.
22. Process Filtering system: Scruber to be mentionned as optional
23. Emission Standards Compliance: BS 3316 or equivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22. The supplier must give batches of spare parts of first urgency and consumable of the
incinerator.
23. The installed incinerator must bear a one year guarantee.
24. The supplier shall perforn an onsite installation of the incinerator.
25. The technical training of operators will have to be provided and given by a technician from the
factory; it will consist of curative and preventive maintenance, and the use of machine, etc
NB.; Civil works and any other related services for the installation and training of operators must be included in the incinerator's price.
Specification for the shelter of the incinerator:
House of the incinerator inclusive in offer (the house must have toilet and hand washing facilities and firefighting). The size of the shelter shall measure four meter by six meter and shall be provided with adequate air ventilation.
This material and equipment must include in the shed of the incinerator: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel frame (charpente en metal); roofing in sheet B.C.A. 28 BG
Orignal From: HIGH TECH PYROLYTIC MEDICAL WASTE INCINERATOR
1. Capacity of destruction in weight: 60 Kg/h.
2. It should be able to operate not less than 10 hours/day
3. This incinerator must be able to destruct all combustible wastes produced by hospitals,
private clinics, laboratories, institutes, etc...
4. Design Specification : Types A, B, C, D, and E of medical waste
5. PYROLYTIC" combustion, by controlling the gasification of waste.
6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the
loadings.
7. It should be able to reduce the volume of wastes by 98%.
8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.
9. The incineration should be completely free from visible smoke as well as offensive odours.
10. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
• The Temperatures of combustion: Minimum will be 850°C and max 1400°C
• Post combustion: > 1100°C.
11. The Internal diameter of the Chimney: Ø 400 and its height: 8 m
12. The Volume of the combustion chamber: 1.200 L
13. The Dimension of the door for loading in cm: 70x70.
14. Burner operation should be Automatic On/Off
15. Fuel: diesel
16. The supplier must provide necessary information for the best of the installation This incinerator
with "PYROLYTIC" combustion must have:
17. A combustion chamber of waste:
* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch
Load
* A burner of lighting which the use is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and
stuffing insulating out of refractor.-.
* The insulation of the combustion chamber should be composed of refractory bricks,
having a high content of aluminium and insulates bricks in order to assure a minimum
temperature on the outside sheet metal.
* Composition of the refractory;
• Refractory concrete:
> Thickness: > 100 mm "
> Nature: 42% of A1203
• Insulate in fibrous panels :
> Thickness: > 75 mm
> Nature: Calcium silicate.
* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging
flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice
gate of regulation and isolating valve.
* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.
18. A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total recombustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
• Refractory concrete :
> Thickness: > 150 mm
> Nature: 65% of A1203
• Insulate in fibrous panel:
> Thickness: > 85 mm
> Nature: Calcium
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of
electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating
valve.
* A secondary injection of air to ensure perfect oxygen content.
19. A control box ensuring the complete cycle of combustion.
20. Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being
carried out by valves and following the control of the automatic cycle.
21. Controls and regulations:
Control box watertight to dust, including:
* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion,
* A regulator with digital watching for the temperature of postcombustion.
* Electric box.
21. The de- ashing must be done in the bottom of the combustion chamber or the deashing
should be Automatic or manual batch de ashing.
22. Process Filtering system: Scruber to be mentionned as optional
23. Emission Standards Compliance: BS 3316 or equivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22. The supplier must give batches of spare parts of first urgency and consumable of the
incinerator.
23. The installed incinerator must bear a one year guarantee.
24. The supplier shall perforn an onsite installation of the incinerator.
25. The technical training of operators will have to be provided and given by a technician from the
factory; it will consist of curative and preventive maintenance, and the use of machine, etc
NB.; Civil works and any other related services for the installation and training of operators must be included in the incinerator's price.
Specification for the shelter of the incinerator:
House of the incinerator inclusive in offer (the house must have toilet and hand washing facilities and firefighting). The size of the shelter shall measure four meter by six meter and shall be provided with adequate air ventilation.
This material and equipment must include in the shed of the incinerator: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel frame (charpente en metal); roofing in sheet B.C.A. 28 BG
Orignal From: HIGH TECH PYROLYTIC MEDICAL WASTE INCINERATOR
Thursday, January 5, 2017
Capacity of destruction in weight 60 Kg/h
medical waste incinerator solutions and prices for 100 bed / 500 bed / 1000 bed / 3000 bed hospitals.
- Assumption: general hospital beds 50%, operation beds 50% for the 100 bed hospital case, while this
ratio is 30-70% for the other cases
- international standards and waste creations assumptions should apply
INCINERATOR, DIESEL.
CAPACITY : Burner 150 kg/hr.
Quantity : Two [2] with complete accessories.
Types of wastes being used: GENERAL WASTE.Polyester, polypropylene, polystyrene, vinyl acetate plastic, synthetic
plastics,
natural rubber, synthetic rubber, polyurethane sheet, and bulky films, solids and
- particles that can be easily sorted
- Items that easily degenerate such as paper, wood, leather and garbage
- Chemical waste solids and liquids, waste oil and other difficult-to-handle items
The machines will be certified for operation from PME after passing site investigations.Manual load twin chamber
incinerator for medical waste to burn 50kg/hr on continuous operation, with Primary temperature in the region of
800degC minimum and 1200degC or more in the Secondary chamber, complete with charging door, Ash door, Air and view
ports, auxiliary air system with adjustable dampers, burners and burner control system and ignition unit, the whole to
meet NEMA requirements and other international standards. Здравствуйте! Меня интересует пе
чь для сжигания медицинских отходов инсинератор на 300 кг и 500 кг. Ж
ду ответа. Стоимость и доставка до г.Алматы Казахстан
The technical details we care about are:
- Capacity (burning capacity of waste per hour). 150kg/hour.Incinerator with 300l waste chamber
- Build materials, 5mm High quality mild steel construction ; 100 mm high quality refractory lining.
- High Temperature paint finish.we have 2 hospitals,more then 20 dentist offices,and over 50 doctor offices.
would it be possible to give us info on the capacity of incinerator we need
on this island.
- Up to 150 KG/Hrs. incinerator to dispose our daily normal mortality for this size of the farm.1.can the
100kg/hr burn solid waste/hazardous waste like expired paints,waste oil or chemicals.
2.What about the heat generated during burning,are there windows or air flow into the containers.
- Consumption of power and fuel. hospital waste disposal system for a hospital project
- Ash removal odor.The incinerator is for HAZARDOUS WASTE and SOLID WASTE and minimal carbon emission.
- Automatic curing process temperature controlled chamber.Incinerator with 150l waste chamber
- Secondary chamber.
1. Do you have plans for above incinerators showing floor dimensions ,height. INCINERATOR FOR SMALL ANIMALS ABOUT 70-
100 KGR/PER TIME
2. What materials should be used for the FLOOT, WALLS, ROOF ETC.1) The only consumable required for the system TS100
(PLC) is Oil( diesel) is that OK?
2) from your technical specification: oil consumption (Kg/hour) is between 14--28) do you mean is liters/hour?
example the incinerator will be operating for 10 hours per day means the oil consumption will be ~140 Liters or more?
3) Chimney type stainless steel. how about main body construction materials?if there are more two option of main body
construction materials for better lifetime
3. Send info about electricity, ventilation, fire protection, exhausts, chimney etc
4.Do you have prefabricated shelters?Installation of waste disposal system (biomedical) 500kg capacity model, MP 500
medical incinerator.
5. We see you have container shelters . Send us price estimate for this item
1. Capacity of destruction in weight: 60 Kg/h.
2. It should be able to operate not less than 10 hours/day
3. This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics,
laboratories, institutes, etc…
4. Design Specification : Types A, B, C, D, and E of medical waste
5. "PYROLYTIC" combustion, by controlling the gasification of waste.
6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
7. It should be able to reduce the volume of wastes by 98%.
8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.
9. The incineration should be completely free from visible smoke as well as offensive odours.
10. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
• The Temperatures of combustion: Minimum will be 850oC and max 1400oC
• Post combustion: >1100oC.
11. The Internal diameter of the Chimney: Ø 400 and its height: 8 m
12. The Volume of the combustion chamber: 1.200 L
13. The Dimension of the door for loading in cm: 70x70.
14. Burner operation should be Automatic On/Off
15. Fuel : diesel
16. The supplier must provide necessary information for the best of the installation
This incinerator with "PYROLYTIC" combustion must have:
17. A combustion chamber of waste:
* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch Load
* A burner of lighting which the use is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating
out of refractory.
* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium
and insulates bricks in order to assure a minimum temperature on the outside sheet metal.
* Composition of the refractory;
• Refractory concrete :
. Thickness : ≥100 mm
. Nature: 42% of Al203
• Insulate in fibrous panels :
. Thickness: ≥75 mm
• Nature: Calcium silicate.
* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of
electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.
18. A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total re-combustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
• Refractory concrete :
Thickness : ≥150 mm
Nature: 65% of Al203
• Insulate in fibrous panel :
Thickness: ≥85 mm
Nature: Calcium
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic
ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* A secondary injection of air to ensure perfect oxygen content.
19. A control box ensuring the complete cycle of combustion.
20. Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and
following the control of the automatic cycle.
21. Controls and regulations:
Control box watertight to dust, including:
* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion.
* A regulator with digital watching for the temperature of post combustion.
* Electric box.
21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual
batch de ashing.
22. Process Filtering system: Scrubber to be mentioned as optional
23. Emission Standards Compliance: BS 3316 or equivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22. The supplier must give batches of spare parts of first urgency and consumable of the incinerator.
23. The installed incinerator must bear a one year guarantee.
24. The supplier shall perform an onsite installation of the incinerator.
25. The technical training of operators will have to be provided and given by a technician
from the factory; it will consist of curative and preventive maintenance, and the use of machine, etc
Orignal From: Capacity of destruction in weight 60 Kg/h
- Assumption: general hospital beds 50%, operation beds 50% for the 100 bed hospital case, while this
ratio is 30-70% for the other cases
- international standards and waste creations assumptions should apply
INCINERATOR, DIESEL.
CAPACITY : Burner 150 kg/hr.
Quantity : Two [2] with complete accessories.
Types of wastes being used: GENERAL WASTE.Polyester, polypropylene, polystyrene, vinyl acetate plastic, synthetic
plastics,
natural rubber, synthetic rubber, polyurethane sheet, and bulky films, solids and
- particles that can be easily sorted
- Items that easily degenerate such as paper, wood, leather and garbage
- Chemical waste solids and liquids, waste oil and other difficult-to-handle items
The machines will be certified for operation from PME after passing site investigations.Manual load twin chamber
incinerator for medical waste to burn 50kg/hr on continuous operation, with Primary temperature in the region of
800degC minimum and 1200degC or more in the Secondary chamber, complete with charging door, Ash door, Air and view
ports, auxiliary air system with adjustable dampers, burners and burner control system and ignition unit, the whole to
meet NEMA requirements and other international standards. Здравствуйте! Меня интересует пе
чь для сжигания медицинских отходов инсинератор на 300 кг и 500 кг. Ж
ду ответа. Стоимость и доставка до г.Алматы Казахстан
The technical details we care about are:
- Capacity (burning capacity of waste per hour). 150kg/hour.Incinerator with 300l waste chamber
- Build materials, 5mm High quality mild steel construction ; 100 mm high quality refractory lining.
- High Temperature paint finish.we have 2 hospitals,more then 20 dentist offices,and over 50 doctor offices.
would it be possible to give us info on the capacity of incinerator we need
on this island.
- Up to 150 KG/Hrs. incinerator to dispose our daily normal mortality for this size of the farm.1.can the
100kg/hr burn solid waste/hazardous waste like expired paints,waste oil or chemicals.
2.What about the heat generated during burning,are there windows or air flow into the containers.
- Consumption of power and fuel. hospital waste disposal system for a hospital project
- Ash removal odor.The incinerator is for HAZARDOUS WASTE and SOLID WASTE and minimal carbon emission.
- Automatic curing process temperature controlled chamber.Incinerator with 150l waste chamber
- Secondary chamber.
1. Do you have plans for above incinerators showing floor dimensions ,height. INCINERATOR FOR SMALL ANIMALS ABOUT 70-
100 KGR/PER TIME
2. What materials should be used for the FLOOT, WALLS, ROOF ETC.1) The only consumable required for the system TS100
(PLC) is Oil( diesel) is that OK?
2) from your technical specification: oil consumption (Kg/hour) is between 14--28) do you mean is liters/hour?
example the incinerator will be operating for 10 hours per day means the oil consumption will be ~140 Liters or more?
3) Chimney type stainless steel. how about main body construction materials?if there are more two option of main body
construction materials for better lifetime
3. Send info about electricity, ventilation, fire protection, exhausts, chimney etc
4.Do you have prefabricated shelters?Installation of waste disposal system (biomedical) 500kg capacity model, MP 500
medical incinerator.
5. We see you have container shelters . Send us price estimate for this item
1. Capacity of destruction in weight: 60 Kg/h.
2. It should be able to operate not less than 10 hours/day
3. This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics,
laboratories, institutes, etc…
4. Design Specification : Types A, B, C, D, and E of medical waste
5. "PYROLYTIC" combustion, by controlling the gasification of waste.
6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
7. It should be able to reduce the volume of wastes by 98%.
8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.
9. The incineration should be completely free from visible smoke as well as offensive odours.
10. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
• The Temperatures of combustion: Minimum will be 850oC and max 1400oC
• Post combustion: >1100oC.
11. The Internal diameter of the Chimney: Ø 400 and its height: 8 m
12. The Volume of the combustion chamber: 1.200 L
13. The Dimension of the door for loading in cm: 70x70.
14. Burner operation should be Automatic On/Off
15. Fuel : diesel
16. The supplier must provide necessary information for the best of the installation
This incinerator with "PYROLYTIC" combustion must have:
17. A combustion chamber of waste:
* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch Load
* A burner of lighting which the use is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating
out of refractory.
* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium
and insulates bricks in order to assure a minimum temperature on the outside sheet metal.
* Composition of the refractory;
• Refractory concrete :
. Thickness : ≥100 mm
. Nature: 42% of Al203
• Insulate in fibrous panels :
. Thickness: ≥75 mm
• Nature: Calcium silicate.
* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of
electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.
18. A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total re-combustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
• Refractory concrete :
Thickness : ≥150 mm
Nature: 65% of Al203
• Insulate in fibrous panel :
Thickness: ≥85 mm
Nature: Calcium
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic
ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* A secondary injection of air to ensure perfect oxygen content.
19. A control box ensuring the complete cycle of combustion.
20. Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and
following the control of the automatic cycle.
21. Controls and regulations:
Control box watertight to dust, including:
* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion.
* A regulator with digital watching for the temperature of post combustion.
* Electric box.
21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual
batch de ashing.
22. Process Filtering system: Scrubber to be mentioned as optional
23. Emission Standards Compliance: BS 3316 or equivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22. The supplier must give batches of spare parts of first urgency and consumable of the incinerator.
23. The installed incinerator must bear a one year guarantee.
24. The supplier shall perform an onsite installation of the incinerator.
25. The technical training of operators will have to be provided and given by a technician
from the factory; it will consist of curative and preventive maintenance, and the use of machine, etc
Orignal From: Capacity of destruction in weight 60 Kg/h
Monday, January 2, 2017
Incinerator capable of treating between 300 & 500 kgs fitted with the wet scrubber system
Automatic loading and reloading with capacity of 10 to 12 tons per day working with gas treatment methods and gas fuel and should comply with the European Standards.the Government Hospital for Medical Waste Incinerator with the following Specifications. they are having general wastes like tissues, plastic bottles etc ,wastes coming from labour camps, to be incinerated, they need, 50kg/hr incinerator
MEDICAL WASTE INCINERATOR.our hospital produce 40 kg every day from all waste material
- Capacity: 1000 kg/h
- Type waste: industrial waste
- Other requirements: Automatic waste loading system and exhaust treatment system.
1. Capacity: 100kgs per batch
2. Temperature
I. Primary Chamber 600- 800
ii. Secondary chamber 850- 1500
3. Consumption per batch: 3.2hrs
4. Fuel consumption: 7 litres per batch. Incinerator capable of treating between 300 & 500 kgs fitted with the wet scrubber system.complete Incinerator with a capacity of 500kgs/ hr with a wet scrubber unit. a 10-20Kg per hour of domestic waste? Also, I would like to know what is the minimum capacity incinerator you have in case we need something smaller?a Waste Incinerator of 500 Metric Tonne per day burning capacity as I am in possession of a large volume of mixed/municipal waste (4/5 million tonnes) of the following composition (52% organic, 12% plastic, 16% paper, 6% metal, 4% glass and 10% other).The EU codes of the waste are as follows: 20 03 01, 19 12 10 and 19 12 12.
One of the key deciding factors of the potential supplier is the energy consumption of the plan, indicated either per hour or per day and I would appreciate if such information can be made available.
Orignal From: Incinerator capable of treating between 300 & 500 kgs fitted with the wet scrubber system
MEDICAL WASTE INCINERATOR.our hospital produce 40 kg every day from all waste material
- Capacity: 1000 kg/h
- Type waste: industrial waste
- Other requirements: Automatic waste loading system and exhaust treatment system.
1. Capacity: 100kgs per batch
2. Temperature
I. Primary Chamber 600- 800
ii. Secondary chamber 850- 1500
3. Consumption per batch: 3.2hrs
4. Fuel consumption: 7 litres per batch. Incinerator capable of treating between 300 & 500 kgs fitted with the wet scrubber system.complete Incinerator with a capacity of 500kgs/ hr with a wet scrubber unit. a 10-20Kg per hour of domestic waste? Also, I would like to know what is the minimum capacity incinerator you have in case we need something smaller?a Waste Incinerator of 500 Metric Tonne per day burning capacity as I am in possession of a large volume of mixed/municipal waste (4/5 million tonnes) of the following composition (52% organic, 12% plastic, 16% paper, 6% metal, 4% glass and 10% other).The EU codes of the waste are as follows: 20 03 01, 19 12 10 and 19 12 12.
One of the key deciding factors of the potential supplier is the energy consumption of the plan, indicated either per hour or per day and I would appreciate if such information can be made available.
Orignal From: Incinerator capable of treating between 300 & 500 kgs fitted with the wet scrubber system
Animal body parts,other biomedical waste,organs dung
51.No Features $_pecific tions
1 (Incinerator)
Type of waste for disposal Animal body parts,other biomedical waste,organs dung, bedding materials,plant p缸ts and food itemsι
Incinerators for conversion of waste to fine,white sterile
ash with no visible smoke or odour
2. Load capacity 300 - 4∞Kg (maximum)
3. Bum capacity 100 Kgjhr (minimum)
4 Fuel Diesel (LDOjHSD)
5. Type of Bumer operation Automatic diesel fired
6. Primary chamber Solid hearth
Dense refractory concrete lining
Operating temeeralure of 850 土 50 deg C or more
7. Secondary chamber Slid heath
Dense refractory concrete lining
Opera恤19 temperature of 1∞o deg C or more
8. Temperature control Digital temperature control and display
Temperature monitoring and thermostatic control
9. Power supply 220V for control Box
10 Size Compact design preferred
11. Opening lid Large top open归g lid (Approx . 700 mm x 500mm) for
easy loading
12. Fuel tank 100-150 L
13. Civil works, installation and
comnuss!Onmg lndusive of civil works (brick wall incinerator house
with a shutter door,CGI sheet roofing) according to 由e
model of the incinerator.
lnstallation and commissioning of the incinerators including hiring of heavy machineries requ让ed at the time of instalIation .
Electric power supply line to light incinerator house as well as to control box of the incinerator
Onsite demonstrationjperformance test and adequate training of staff on the use of incinerators.
Warranty of one year from the date of commissioning. Separate Annual Maintenance Contract would be drawn with the supplier at a later stage.
14. Catalogue Catalogue containing detail pictures and spec迁ications
of the quoted incinerator must be included in the
bidding document
Orignal From: Animal body parts,other biomedical waste,organs dung
1 (Incinerator)
Type of waste for disposal Animal body parts,other biomedical waste,organs dung, bedding materials,plant p缸ts and food itemsι
Incinerators for conversion of waste to fine,white sterile
ash with no visible smoke or odour
2. Load capacity 300 - 4∞Kg (maximum)
3. Bum capacity 100 Kgjhr (minimum)
4 Fuel Diesel (LDOjHSD)
5. Type of Bumer operation Automatic diesel fired
6. Primary chamber Solid hearth
Dense refractory concrete lining
Operating temeeralure of 850 土 50 deg C or more
7. Secondary chamber Slid heath
Dense refractory concrete lining
Opera恤19 temperature of 1∞o deg C or more
8. Temperature control Digital temperature control and display
Temperature monitoring and thermostatic control
9. Power supply 220V for control Box
10 Size Compact design preferred
11. Opening lid Large top open归g lid (Approx . 700 mm x 500mm) for
easy loading
12. Fuel tank 100-150 L
13. Civil works, installation and
comnuss!Onmg lndusive of civil works (brick wall incinerator house
with a shutter door,CGI sheet roofing) according to 由e
model of the incinerator.
lnstallation and commissioning of the incinerators including hiring of heavy machineries requ让ed at the time of instalIation .
Electric power supply line to light incinerator house as well as to control box of the incinerator
Onsite demonstrationjperformance test and adequate training of staff on the use of incinerators.
Warranty of one year from the date of commissioning. Separate Annual Maintenance Contract would be drawn with the supplier at a later stage.
14. Catalogue Catalogue containing detail pictures and spec迁ications
of the quoted incinerator must be included in the
bidding document
Orignal From: Animal body parts,other biomedical waste,organs dung
incineration Furnace for burning patalogical
incineration Furnace for burning patalogical ( such as human tissue or blood ) as west
The weight of this west materials is 700 kg per month and we need an isolated furnace
Without fume and any harmful gas
. INCINERATOR SPECIFICATION
# Description Specification
1 Burning Capacity - 400 kg/time and should not be less than 300 kg/time. Maximum combustion time must be 6 times/day
2 Chimney external diameter - 300 to 400 mm
3 Fan power - Must not exceed 1.1kw
4 Voltage - 220V
5 Oil consumption - Must not exceed 14kg/h
6 Feeding door diagonal dimension (mm) - Not less than 500mm
7 Incineration Temp. (⁰C) - 800 or above
8 Emission
CO - Must not exceed 100 mg/m3
SO2 - Must not exceed 400 mg/m3
HF - (Hydrogen fluoride) Must not exceed 9.0 mg/m3
NO2 - Must not exceed 500 mg/m3
Smoke dust - Must not exceed 100 mg/m3
9 Height of the Incinerator - Not less than 10m above ground level
10 Manufacturer's Warranty - Not less than 1 year
11 Electrical Connection - From nearest distribution box using 25mm2 electrical cable and all related connections and wiring
Orignal From: incineration Furnace for burning patalogical
The weight of this west materials is 700 kg per month and we need an isolated furnace
Without fume and any harmful gas
. INCINERATOR SPECIFICATION
# Description Specification
1 Burning Capacity - 400 kg/time and should not be less than 300 kg/time. Maximum combustion time must be 6 times/day
2 Chimney external diameter - 300 to 400 mm
3 Fan power - Must not exceed 1.1kw
4 Voltage - 220V
5 Oil consumption - Must not exceed 14kg/h
6 Feeding door diagonal dimension (mm) - Not less than 500mm
7 Incineration Temp. (⁰C) - 800 or above
8 Emission
CO - Must not exceed 100 mg/m3
SO2 - Must not exceed 400 mg/m3
HF - (Hydrogen fluoride) Must not exceed 9.0 mg/m3
NO2 - Must not exceed 500 mg/m3
Smoke dust - Must not exceed 100 mg/m3
9 Height of the Incinerator - Not less than 10m above ground level
10 Manufacturer's Warranty - Not less than 1 year
11 Electrical Connection - From nearest distribution box using 25mm2 electrical cable and all related connections and wiring
Orignal From: incineration Furnace for burning patalogical
a pet incinerator for the cremation of dogs
We have a 70 bed hospital in namibia. however there is a potential of getting customers from other local doctors.
a small incinerators (ex. please see attached) for some empty chemical bags. Can you please provide me with some details information about these type of incinerators (small scale). a pet incinerator for the cremation of dogs and cats. It will be single use of each pet seperately.Initially we are planning to start this Pilot Project with the National Hospital, to convince the Ministry Officials and on its success to take this project to the Teaching Hospitals, District and Base Hospitals in the Country.municipality need 4 crematory machine for cadavers. I need some information about price , kine of energy for activation ,toxic emission,The incinerator we are looking should be with the advantages of Heat recycling system, utilization of hot water, etc. Capacity – 150-200 kgs/hr and with International standards.get more information about the Pet Cremation Equipment, specially for dogs and cats.
Orignal From: a pet incinerator for the cremation of dogs
a small incinerators (ex. please see attached) for some empty chemical bags. Can you please provide me with some details information about these type of incinerators (small scale). a pet incinerator for the cremation of dogs and cats. It will be single use of each pet seperately.Initially we are planning to start this Pilot Project with the National Hospital, to convince the Ministry Officials and on its success to take this project to the Teaching Hospitals, District and Base Hospitals in the Country.municipality need 4 crematory machine for cadavers. I need some information about price , kine of energy for activation ,toxic emission,The incinerator we are looking should be with the advantages of Heat recycling system, utilization of hot water, etc. Capacity – 150-200 kgs/hr and with International standards.get more information about the Pet Cremation Equipment, specially for dogs and cats.
Orignal From: a pet incinerator for the cremation of dogs
Sunday, January 1, 2017
the three incinerators for burning and incineration of drugs and toxic substances
Requirements and specifications for the process of supply, installation, operation and guarantee the three incinerators for burning and incineration of drugs and toxic substances for customs department
Free three years guarantee for incinerators from delivery date. In addition of free spare parts guarantee letter should be valid for 10 years from the end date of guarantee.
Electric unit should be delivered with service manual in English
Electric capacity should be 380-220 v 60 Hz for all equipment
Delivered time as soon as possible
Validity of offer should be not less than 6 months
In case of order, we need two certificates of origin that should be stamped from Saudi embassy in your country
Commercial invoice (certified from Chamber of Commerce)
Two original bills
Send someone to fix and train our staff for 5 people in each location
Send your manuals for installation units
Waiting for your good reply
Please provide details for the following,
1-Technical explanation includes technical specifications, scope of work, the requirements of the operation and maintenance.
2- Technical explanation for technicians training and furnace operators
3- Catalogs of oven with all the required specifications
The offer price must include the following;-
1. Training for technicians and operators for a period not less than two days at each site and give trainees training certificates
Documents must contain all the information such as brochures, technical resources, operating, maintenance manuals, and brochures dealing with the keyboard
2- Letter from the manufacturer to give three years guarantee for incinerators from delivery date. In addition of free spare parts guarantee letter should be valid for 10 years from the end date of guarantee
3- Provide certificate that the incinerators are environmentally friendly and attach proof that environmental protection organizations in the country of Origin and your product should be emissions free due to the sensitivity of its international air ports.
4-copmany must committed delivery, operation, and installation within 60 days from the date of site projects detection
5- Train five people for two days for each device for a period of two days for installation, operation, and safety. Give them certificates
GARANTEE
Provides operating and emergency maintenance also provides free spare parts for three from the starting date of the project. The company must make regular maintenance every 3 months and raise the maintenance report to the management of public concern and Maintenance.
The company must make all the maintenance work as well adjustment of the control and protection devices and filters / filters purify insulation
Specifications of ovens:
• Installing a readymade concrete base (Precast) with Height 30 cm above the ground and 20 cm below the surface of the earth.
• The dimensions of the base are increased by (2 meters) from the edge of incinerators
• The rest of the accessories in all the trends even allows the worker directly feeding and maintenance work, cleaning and move easily taking into account the tendencies of the base toward the door for drainage of water.
• The floor coating must be high-quality epoxy paint.
• Install anti-rust and heat Umbrella of brick and steel (pyramid shape) of (5) meters height above the ground which installed with the edge of the concrete base by thick galvanized columns
• This umbrella Cover the site furnace and allow bringing the chimney
• The site is surrounded by an iron fence (sheet metal) 3 meters height from the surface of the earth in order to protect the incinerators from dust storms
• The iron fence must have a 5 meters Width gate
• Automatic anti-rust and heat electrical circuit must be provided
• The furnaces are highly efficient, emissions-free, safe, and environmentally friendly and have capacity of not less than 3,000 kg of materials and the rate of burning at least 400 kg / h
• The method of feeding the furnace through a side slot or from the top and the emission of the smoke is completely prevented.
• a furnace Must have two rooms, one of them is the main room of not less than the "5" stoves to the process of burning materials and other secondary room of not less "2" stoves to burn resulting gas from the first process as well as the chimney
• The main component of the body of the furnace is stainless steel box, the thickness of not less than 7 mm with a layer of zinc phosphate plated with aluminium reflector to heat
• the thickness of the door of 150 mm and a hardness of not less than 170 kg / m 3 to be burnt, automatic comprehensive remote system.
• Furnaces must be destructive enough to burn and incinerate the material which mentioned previously
• furnaces must have certificates are supported global enterprises and government competent for environmental protection In the country of origin or the General Presidency of Meteorology and Environment Protection in Saudi Arabia
• The oven can work for 24 hours so as to allow for the burning of materials for a period of not less than 12 consecutive hours and the remainder for cooling and provides full fuel tank with a capacity of 1000 L to turn on the oven.
• Must have an automatic ignition and diesel is used
• a furnace has the ability to withstand extreme temperatures up to "130o c And also, it guarantees continuous operation of which can be utilized for 24 hours with the ability to remove residues during the work of the oven, Insulating layer of calcium must be present in the rooms with Thickness not less than 50 mm and a wall thickness of 100 mm
• Isolation of burning room: the space between the walls must be of the "stainless steel". In addition, burn room must fill with Thermal insulation material.
• Ensure that the combustion of materials emitted in the secondary room should be at least two seconds period and the room is lined with high-density ceramic fibbers
• Incinerators must contain a system for processing (purification) gasses before emission of the smoke.
• Incinerators must have the capacity of self-cooling after the end of the daily operating period.
• Incinerators must have chimney not less than "4 meters" height from the surface of the oven, also, it must be thermally insulated and non-rust able, and must also be removable, installation and tide default.
• Electrical capacity required "220/ 380-volt "60 hertz
• Incinerators must be fitted with a control panel of the electronic keys to monitor all the necessary indicators of activation keys, as well as start-up and switch off so as to be isolated inside a metal box with the presence of the following:
Alarm Sensor in the event of (crashes "burner" or purification device or heat leakage or internal connections and wiring)
Monitors for the temperature of the rooms
Aerosols Filter indicators/ monitors
Room temperature sensors
Indicators for furnaces and index overload
Timer for Extinguish the oven automatically depending on the time required.
• All equipment must be highly resistant to external conditions such as high temperature (50oc)
• All doors must have special lock are not allowed non-persons appointed to work.
• Providing fire extinguisher for each site with a capacity of 10 kg at least
Orignal From: the three incinerators for burning and incineration of drugs and toxic substances
Free three years guarantee for incinerators from delivery date. In addition of free spare parts guarantee letter should be valid for 10 years from the end date of guarantee.
Electric unit should be delivered with service manual in English
Electric capacity should be 380-220 v 60 Hz for all equipment
Delivered time as soon as possible
Validity of offer should be not less than 6 months
In case of order, we need two certificates of origin that should be stamped from Saudi embassy in your country
Commercial invoice (certified from Chamber of Commerce)
Two original bills
Send someone to fix and train our staff for 5 people in each location
Send your manuals for installation units
Waiting for your good reply
Please provide details for the following,
1-Technical explanation includes technical specifications, scope of work, the requirements of the operation and maintenance.
2- Technical explanation for technicians training and furnace operators
3- Catalogs of oven with all the required specifications
The offer price must include the following;-
1. Training for technicians and operators for a period not less than two days at each site and give trainees training certificates
Documents must contain all the information such as brochures, technical resources, operating, maintenance manuals, and brochures dealing with the keyboard
2- Letter from the manufacturer to give three years guarantee for incinerators from delivery date. In addition of free spare parts guarantee letter should be valid for 10 years from the end date of guarantee
3- Provide certificate that the incinerators are environmentally friendly and attach proof that environmental protection organizations in the country of Origin and your product should be emissions free due to the sensitivity of its international air ports.
4-copmany must committed delivery, operation, and installation within 60 days from the date of site projects detection
5- Train five people for two days for each device for a period of two days for installation, operation, and safety. Give them certificates
GARANTEE
Provides operating and emergency maintenance also provides free spare parts for three from the starting date of the project. The company must make regular maintenance every 3 months and raise the maintenance report to the management of public concern and Maintenance.
The company must make all the maintenance work as well adjustment of the control and protection devices and filters / filters purify insulation
Specifications of ovens:
• Installing a readymade concrete base (Precast) with Height 30 cm above the ground and 20 cm below the surface of the earth.
• The dimensions of the base are increased by (2 meters) from the edge of incinerators
• The rest of the accessories in all the trends even allows the worker directly feeding and maintenance work, cleaning and move easily taking into account the tendencies of the base toward the door for drainage of water.
• The floor coating must be high-quality epoxy paint.
• Install anti-rust and heat Umbrella of brick and steel (pyramid shape) of (5) meters height above the ground which installed with the edge of the concrete base by thick galvanized columns
• This umbrella Cover the site furnace and allow bringing the chimney
• The site is surrounded by an iron fence (sheet metal) 3 meters height from the surface of the earth in order to protect the incinerators from dust storms
• The iron fence must have a 5 meters Width gate
• Automatic anti-rust and heat electrical circuit must be provided
• The furnaces are highly efficient, emissions-free, safe, and environmentally friendly and have capacity of not less than 3,000 kg of materials and the rate of burning at least 400 kg / h
• The method of feeding the furnace through a side slot or from the top and the emission of the smoke is completely prevented.
• a furnace Must have two rooms, one of them is the main room of not less than the "5" stoves to the process of burning materials and other secondary room of not less "2" stoves to burn resulting gas from the first process as well as the chimney
• The main component of the body of the furnace is stainless steel box, the thickness of not less than 7 mm with a layer of zinc phosphate plated with aluminium reflector to heat
• the thickness of the door of 150 mm and a hardness of not less than 170 kg / m 3 to be burnt, automatic comprehensive remote system.
• Furnaces must be destructive enough to burn and incinerate the material which mentioned previously
• furnaces must have certificates are supported global enterprises and government competent for environmental protection In the country of origin or the General Presidency of Meteorology and Environment Protection in Saudi Arabia
• The oven can work for 24 hours so as to allow for the burning of materials for a period of not less than 12 consecutive hours and the remainder for cooling and provides full fuel tank with a capacity of 1000 L to turn on the oven.
• Must have an automatic ignition and diesel is used
• a furnace has the ability to withstand extreme temperatures up to "130o c And also, it guarantees continuous operation of which can be utilized for 24 hours with the ability to remove residues during the work of the oven, Insulating layer of calcium must be present in the rooms with Thickness not less than 50 mm and a wall thickness of 100 mm
• Isolation of burning room: the space between the walls must be of the "stainless steel". In addition, burn room must fill with Thermal insulation material.
• Ensure that the combustion of materials emitted in the secondary room should be at least two seconds period and the room is lined with high-density ceramic fibbers
• Incinerators must contain a system for processing (purification) gasses before emission of the smoke.
• Incinerators must have the capacity of self-cooling after the end of the daily operating period.
• Incinerators must have chimney not less than "4 meters" height from the surface of the oven, also, it must be thermally insulated and non-rust able, and must also be removable, installation and tide default.
• Electrical capacity required "220/ 380-volt "60 hertz
• Incinerators must be fitted with a control panel of the electronic keys to monitor all the necessary indicators of activation keys, as well as start-up and switch off so as to be isolated inside a metal box with the presence of the following:
Alarm Sensor in the event of (crashes "burner" or purification device or heat leakage or internal connections and wiring)
Monitors for the temperature of the rooms
Aerosols Filter indicators/ monitors
Room temperature sensors
Indicators for furnaces and index overload
Timer for Extinguish the oven automatically depending on the time required.
• All equipment must be highly resistant to external conditions such as high temperature (50oc)
• All doors must have special lock are not allowed non-persons appointed to work.
• Providing fire extinguisher for each site with a capacity of 10 kg at least
Orignal From: the three incinerators for burning and incineration of drugs and toxic substances
cytotoxic waste
Our interest is for disposing mainly cytotoxic waste, namely out of date or out of specifications cytotoxic pharmaceuticals. Other wastes for which we'd like to dispose along with the cytotoxic waste consists of out of date or out of specifications psychotropic pharmaceuticals (but not necessarily narcotics), sharps (needles) etc.
It is also very important for us to know if the unit is eligible to treat cytotoxic waste and also the characteristics and disposal of treatment residues. Moreover, operational needs in terms of energy and fuel consumption, as well as especially the off-gas treatment system applied, bear significant importance, as meeting the demands of Regulation 2010/75/EC is naturally necessary.
The quantity of disposal is about 100 kg per day as minimum. Bigger capacities up to 500-600 kg/d are also of great interest to us. Thus, please send us your proposal for both aforementioned daily capacities.
Orignal From: cytotoxic waste
It is also very important for us to know if the unit is eligible to treat cytotoxic waste and also the characteristics and disposal of treatment residues. Moreover, operational needs in terms of energy and fuel consumption, as well as especially the off-gas treatment system applied, bear significant importance, as meeting the demands of Regulation 2010/75/EC is naturally necessary.
The quantity of disposal is about 100 kg per day as minimum. Bigger capacities up to 500-600 kg/d are also of great interest to us. Thus, please send us your proposal for both aforementioned daily capacities.